Design, Detail Design Development, Construction Supervision
Project period: 2009 – 2014
General Designer: Institute Stroyproekt JSC
Client: Federal Highway Agency Directorate for Construction and Reconstruction of Motor Roads of the Black Sea Coast


The Project is implemented in 3 stages (Stage I Section between the Agura and Zemlyanichnaya street is 5,670 m long; Stage II Section from Zemlyanichnaya street to the Sochi River is 5,280 m long and  Stage III includes a 5,330 m long section from the Sochi River to the Psakhe River).

Main technical parameters:
 – length: 16.3 km
 – lanes: 4 (in both directions)
 – total length of engineering structures (flyovers and tunnels): over 20 km (in both directions).

Almost the whole road will be located at flyovers and in tunnels. The Project includes: 19 bridges and flyovers, 15 tunnels and 7 traffic interchanges.

On  27 January 2013 Stage I of the road was opened for traffic.

Sochi By-pass and Back-up of Kurortny Prospect. Back-up of Kurortny Prospect is indicated in the chart as pink line:  

  Карта_Дублер_Обход_cr.jpg





















The entire Back-up of Kurortny Prospect in Sochi is open for traffic 04.02.2014 The entire Back-up of Kurortny Prospect in Sochi is open for traffic

The unique state-of-the-art motorway will relieve traffic congestion in the city.
 
 

 