Design, detailed design
Project period: 2020 –
Present
General Designer: Institute Stroyproekt AO
Client: Russian Highways State Company (AVTODOR).
The new highway is designed to divert transit traffic coming from the western Russian regions towards Nizhnekamsk and Naberezhnye Chelny, and further to Ufa, bypassing a congested road along the dam of Nizhnekamsk hydropower plant. The bypass includes a new bridge over the Kama near Kotlovka and Ilyinka.
Our engineers have developed and considered five route alternatives to choose the optimal one, both in technical and economic terms.
Technical parameters
The bridge over the Kama is the longest structure of the bypass.
Technical parameters
A BIM model has been developed for the project.
|